Objeto
Execution of the construction works of the Cascatinha Treated Water Pumping Station for the Municipal Department of Water and Sewage.
Location
Porto Alegre / Rio Grande do Sul / Brazil
Technical information
Suction and discharge pipes up to DN 1000 in carbon steel
Pumping system: 1.775 hp
Substation: 1.300 kVA
Flow rate: 300 l/s
Area: 390 m²