Objeto
Execution of works to expand the sewage system including interceptors, collection network, Sewage Treatment Station and building connections for Companhia de Saneamento do Paraná.
Location
Londrina / Paraná / Brazil
Technical information
Expansion of the ETE to flow of 1,002 l/s
Expansion of pre-treatment grating
Sludge Dewatering and Inerting System
Secondary decanter
Execution of Activated Sludge Tank by diffuse air aeration system
Execution of the Entry System
Execution of 06 Elevator
Execution of 04 Energy Substations
Drying Bed Execution