SANTA FÉ – ADVERTISER DEVIATION ARIJON – SECOND STAGE – JUMPER 4

Execution of the trunk aqueduct works with tubes of 1000 mm, 900 mm and 700 mm in PRFV - Reinforced Polyester with Fiberglass, derivations for each of the cisterns, construction of the structures (cisterns), hydraulic installations, electrical, electromechanical and automation systems for the Ministry of Economy of Santa Fé.

Location

Between the cities of San Mariano and Sa Pereyra / Santa Fé Province / Argentina

Technical information

Execution of the works corresponding to the trunk section between the Pumping Station Nº4, in San Mariano, for the arrival chamber of the cistern of the Pumping Station Nº5, in Angélica, with 2 derivations to supply water to the cisterns of San Mariano and Sa Pereyra, including the civil works that correspond to the cisterns in each location.
Trunk extension: 27,600 m
Extension lines: 4,153 m
Pumping Station 4: Q = 850 l/s - 75mca
San Mariano Cistern: 20 m³ - in GRP
Cisterna SA Pereyra: 50 m³ - reinforced concrete
Telesupervision and control system: fiber optic remote management and control system (data transmission and reception)
Power suply system