Works / International / Argentina

SANTA FÉ – ADVERTISER DEVIATION ARIJON – SECOND STAGE – JUMPER 5

Execution of the trunk aqueduct works with tubes of 1000 mm, 900 mm and 700 mm in PRFV - Reinforced Polyester with Fiberglass, derivations for each of the cisterns, construction of the structures (cisterns), hydraulic installations, electrical, electromechanical and automation systems for the Ministry of Economy of Santa Fé.

Location

Between cities of San Mariano and Sa Pereyra / Santa Fé province / Argentina

Technical information

Execution of the works corresponding to the trunk section between the Pumping Station Nº5, to the entrance chamber of the Rafaela cistern, with 2 derivations to supply water to the Angélica and Susana cisterns, including civil works corresponding to the cisterns in each location.
Trunk extension: 32,700 m
Extension lines: 11.339 m
Pumping station 5: Q = 771 l/s - 82 mca
Rafaela cistern: 3.360 m³ - reinforced concrete
Angelica cistern: 148 m³ - reinforced concrete
Susana cistern: 304 m³ - reinforced concrete
Telesupervision and control system: fiber optic remote management and control system (data transmission and reception)
Power suply system

Develop your project with quality.

TOP
Folders GEL