Location
Between cities of San Mariano and Sa Pereyra / Santa Fé province / Argentina
Technical information
Execution of the works corresponding to the trunk section between the Pumping Station Nº5, to the entrance chamber of the Rafaela cistern, with 2 derivations to supply water to the Angélica and Susana cisterns, including civil works corresponding to the cisterns in each location.
Trunk extension: 32,700 m
Extension lines: 11.339 m
Pumping station 5: Q = 771 l/s - 82 mca
Rafaela cistern: 3.360 m³ - reinforced concrete
Angelica cistern: 148 m³ - reinforced concrete
Susana cistern: 304 m³ - reinforced concrete
Telesupervision and control system: fiber optic remote management and control system (data transmission and reception)
Power suply system