Works / International / Argentina

INTERNATIONAL SANTA FÉ – ADVERTISER DEVIATION ARIJON – SECOND STAGE – JUMPER 4

Objeto

Execution of the trunk aqueduct works with tubes of 1000 mm, 900 mm and 700 mm in PRFV - Reinforced Polyester with Fiberglass, derivations for each of the cisterns, construction of the structures (cisterns), hydraulic installations, electrical, electromechanical and automation systems for the Ministry of Economy of Santa Fé.

Location

Between cities of San Mariano and Sa Pereyra / Santa Fé province / Argentina

Technical information

Trunk extension: 27,600 m;
Extension lines: 4,153 m;
Pumping Station 4: Q = 850 l/s - 75 mca;
San Mariano Cistern: 20 m³ - in GRP;
Cisterna SA Pereyra: 50 m³ - reinforced concrete;
Telesupervision and control system: fiber optic remote management and control system (data transmission and reception);
Power suply system.