Objeto
EXECUTION OF THE CONSTRUCTION SERVICES FOR A SHP (SMALL HYDROELECTRIC POWER PLANT) LOCATED AT THE CONFLUENCE OF THE MARRECADAS AND CACHOEIRINHA RIVERS. PRUDENTÓPOLIS E TURVO/PR – INSTALLED POWER – 82.800 KW
Location
Turvo / Paraná / Brazil
Deadline
Mar/2021 to Dec/2022
Technical information
MAIN QUANTITATIVES:
EXCAVATION 1,229,010 m³
LANDFILE 293,728 m³
ROCKFILL 33,055 m³
CCV CONCRETE 33,746 m³
CCR CONCRETE 30,050 m³
TUNNEL SECTION 4.50 X 4.50 - 970 m
ADDUCTION CHANNEL 2,880 m
CONTRACT VALUE
US$ 33 million
WORKFORCE
420 (22 upper level)