Location
Araucária / Paraná / Brazil
TECHNICAL INFORMATION
Maximum flow: 450 m³/h
Substation Power: 10 MVA
Concrete: 13.021 m³
Earthmoving: 30.210 m³ (Cut)
Earthmoving: 59.936 m³ (Embankment)
Pipe: 722 t
Equipment: 530 units
Cable launches: 303.533 m