Objeto
Execution of works to expand the water supply system - Batch 4.1.5 for Companhia de Saneamento do Paraná.
Location
São José dos Pinhais, Fazenda Rio Grande, Curitiba and Araucária / Paraná / Brazil
Technical information
MND: 192 m
Crossings: 809 m
Distribution Network: 27.299 m
Pipeline: 11.782 m
Reservoir: 5.000 liters
Reservoir: 2.000 liters
EE: 40 hp x 3 cj
EE: 15 hp x 2 cj