Works / Sanitation / Project

PETROBRAS – REPAR UTDI

Objeto

Elaboration of projects and execution of construction works, electromechanical assembly, conditioning and pre-operation assistance, starting and maintenance support for the implementation of the Industrial Waste Treatment Unit - UTDI II at the Refinaria Presidente Getúlio Vargas for Petróleo Brasileiro SA

Location

Araucária / Paraná / Brazil

Technical information

Maximum flow: 450 m³/h
Substation Power: 10 MVA
Concrete: 13.021 m³
Earthmoving: 30.210 m³ (Cut)
Earthmoving: 59.936 m³ (Embankment)
Pipe: 722 t
Equipment: 530 units
Cable launches: 303.533 m

Develop your project with quality.

TOP
Folders GEL